Park Road, St Helens

The design and construction of timber frames for 35 units of social housing including a block of 3 storey flats.

Lockwoods Construction has a long history of utilising timber frame for the delivery of social housing schemes. It values the speed and predictability of bringing the building from slab to watertight to allow the internal works to commence without risking delay from inclement weather. Couple with this the issues of obtaining skilled bricklayers and at times bricks and blocks, timber frame takes these issues off the programme’s critical path. 

Sticx was able to convert a masonry design into timber frame and help the design team meet the stringent insulation requirements required in modern house building.

  • CLIENT Lockwoods Construction Ltd.
  • SIZE35 UNITS & 3 STOREY FLAT
  • PRICE£350,000
  • LOCATIONST HELENS
  • ARCHITECTDK ARCHITECTS
  • ENGINEERROGER BULLIVANT